china supplier CF8 CF8m Stainless Steel Clamp Coupling for Filling Machine with Casting manufacturers

Merchandise Description

Solution Description

Material

304/316/316L/CF3/CF8/CF8M/1.4301/1.4408/1.4404/SCH22/SCS13/SCS14/seventeen-4PH/WCB/GS45/HK

Regular

DIN / JIS / ASTM / ASME / BS / GB / ISO

Thread Ending NPT / BSPT / BSP / DIN / ISO 
Item bodyweight 0.005kg~45kg
Dimensional tolerance Casting ISO8062 CT5~CT7 Machining ISO2768
Manufacturing procedure Precision casting, investment decision casting, precision machining NC/CNC

Application

Stainless Metal Pipe System,drinking water system, petrolum system etc.Medication, food, chemical sector, and many others

Variety Tee, elbow, union, pair wire, quick connector, clamp connector, valve, valve physique,
pump, impeller, mechanical components, food equipment, stainless steel CZPT ized elements

Provider

OEM 

Supply

By Sea / By Air / By Express

Transport port ZheJiang / QingDao / ZheJiang /BeiJin 

Packing

Carton Box / Plywood Circumstance / Special CZPT Upon CZPT er Needs

Offer cycle Samples are twenty five-35 days the get can be adjusted in accordance to the scenario for fifty five days of standard manufacturing time period.

Payment Phrases

one hundred% TT / 30%TT in CZPT , stability 70% before supply

Our edge We have far more than 15 a long time of manufacturing management experience
we have specialist technical engineers in expenditure casting, machining and good quality inspection
we have CZPT -expression stable and ongoing optimization of solution top quality and offer cycle management plHangZhou.


Product Display

FAQ
1,What are your strengths?
We have foundry workshop and machining workshop We have an independent quality inspection group and manufacturing process administration staff We can give you with the drawing mapping, mildew or product layout and manufacturing, as well as the inspection and checking administration of your items in CZPT
two,When can I get the cost?
The quotation shall offer in depth and full data within 24 several hours after receiving the inquiry. And answers.
three,How CZPT can you complete the sample?
It is typically concluded in 3-5 months CZPT ent goods change the cycle.
4,How CZPT can you complete the get?
After acquiring the sample confirmation details, the casting time is typically 6-7 weeks The finished item was extra for another 2-3 months

We welcome your inquiry and cooperation!
HangZhou haoxu CZPT ctric CZPT nology Co., Ltd

china  supplier CF8 CF8m Stainless Steel Clamp Coupling for Filling Machine with Casting manufacturers